Category Archives: Bicycling

What is a “Sharrow”?

Sharrows. I’m sure you’ve seen them. Perhaps you’ve even heard about them. What do they mean? A “sharrow” or Shared Lane Marking is a newer addition to roadway striping. They are designed to be along major bicycle routes where a bicycle lane is impractical. The markings show that motorists should not only expect to see cyclists but they should also be further out in the lane.

Sharrows on Howard Ave near 30th St.
Sharrows on Howard Ave near 30th St.

The rules behind these markings are fairly simple. They must be 13′ from the curb and beyond the “door zone”. These sharrows cannot be on roadways with a speed limit greater than 30 mph, though there are some exceptions such as Park Blvd through Balboa Park, which is signed as 40 mph. When a roadway is not marked with sharrows, the rules are still the same. According to the California Vehicle Code (CVC 21202(a)), a cyclist doesn’t always have to ride to the right side of the roadway. The term used is “as far right as practicable”. This means that if roadway conditions warrant, a cyclist may travel away from the right side. When a roadway is marked with sharrows, cyclists should ride with the tires lining up with the arrows.

So, Sharrow or no, a roadway must be shared with cyclists.

Reference:

California MUTCD 2026 – Part 9, Ch. 9A, Section9E.09 – pg 1646

Page 1688 shows proper placement locations

Fixing problems in San Diego – And how you can help

In the City of San Diego, there are many roadways with problems. Some are badly cracked, crumbling, filled with potholes, and worse. The City has been working toward repaving a lot of roads over the past couple years, which has helped greatly. However, more is needed. In the case of smaller problems, you can contact the City online and report issues. I’ve done this for many locations and have had good results. The latest was to help correct a striping problem on Park Blvd. Bike lanes were added on Park Blvd between Morley Field Drive and Cypress Ave. To do so, the median of the roadway had to be reduced. This left older, albeit somewhat faded, striping left behind. This striping tended to confuse motorists who would then either drive in the bike lane or really close to it, when they had a lot more lane left. Having had some problems here myself with this issue, I contacted the City and they fixed it. I strongly encourage anyone to make these requests and help make our city a better place to live.

Before the striping was fixed. You can still see the old setup.
Before the striping was fixed. You can still see the old setup.

Southbound from Cypress Ave. Note how the old striping is far to the right from the new stripe.
Southbound from Cypress Ave. Note how the old striping is far to the right from the new stripe.

Northbound toward Cypress Ave. The old striping was painted over in black.
Northbound toward Cypress Ave. The old striping was painted over in black.

San Luis Obispo to Santa Clarita Double Century – May 29, 2011

My first double century ride would go from San Luis Obispo to Santa Clarita. It would be the longest ride I had ever set out to do, breaking my distance record by at least 46 miles. The plan was simple. I would follow the same route as I took in May last year from San Luis Obispo to Ventura, but adding the segment to Santa Clarita.  For those wanting more details of my route, I went the following way:
From San Luis Obispo:
Hwy 227, Price Canyon, Hwy 1, Hwy 135, Hwy 101, “Coast Route” signed bike route from Goleta to Carpinteria, Hwy 101, Hwy 1, Telegraph Rd, Hwy 126, Santa Clara River Trail, Sierra Highway
So, on May 29, I set out from San Luis Obispo at 5:30am, and began the longest ride of my life. The weather was cool at first, and a bit cloudy. Once past Guadalupe, the wet and muddy roadway shoulders I had been dealing with north of town had finally dried up. The winds I had been hoping for also finally materialized south of town. Not only were they consistent in speed, but they were nearly directly behind me – a perfect tailwind. It helped pass the miles and keep me going. I was getting hungry! So, in Los Alamos, I stopped for breakfast at the Twin Oaks Restaurant. I stopped there on my last ride through here, and had a decent and quick breakfast. As I was in full cycling gear (skinsuit, leg and arm warmers, shoe covers), I always seem to get questions about the ride like “Where are you riding from?” – “San Luis Obispo”, “Where are you riding to?” – “Santa Clarita”… yes, a long ways down the road. Still, 150 miles to go! My pace was pretty fast so far, keeping a 20 mph average for the first 50 miles.
After getting back out on the road, I got onto US 101, the first real busy roadway of the trip. Ahh… US 101 in the Central Coast area. It is my favorite section. A very pastoral scene, rolling hills, oaks, cows, and yes… lots of vehicles on the expressway. After topping the summit, I glided down to Buellton. One more hill down, just one major climb ahead. Being a holiday weekend, heavier traffic wasn’t surprising. One thing I did see that caught my eye though was the high number of antique cars heading southbound. I never did see where they were going, but I lost count after at least 20 passed me.
I stopped in Buellton to refill my drinks, and headed on south. Onwards and upwards to the last major climb of the ride, though with many more miles still to go. The last hill, Nojoqui Canyon and Summit, isn’t that much a climb. The summit itself is lower than the one north of Buellton, but not by much. The last part of the climb is steep, but still not bad. After topping this last summit, it would be downhill to Gaviota. Downhill and downwind… not always a good thing. Winds slowly increased in speed as I got closer to the bottom of the grade. This became a problem when I got up to about 35 mph and was getting battered by sudden crosswinds. I slowed down real fast and kept it slower until I got through the area. Crashing at high speed isn’t pleasant at any location or time and I didn’t want to start now. The next 25 or so miles would be very beautiful and fun. It would be my last rural section until after Ventura. I was able to keep a pretty decent pace, tailwinds and my own energy helping greatly.
At Goleta, I finally reached the halfway point. 100 miles! I hit that mark at 11:20am, with a 20.3 mph average, with a 4:51 rolling time. Not bad… my best century ride yet. It didn’t really hit me until after I was eating my lunch in Goleta that I had gone 100 miles and wasn’t really thinking so much about it. Most rides END around that distance, and here I was only in the middle. So, after having a short lunch, it was again onward. I took an easy course through the Goleta, Santa Barbara, and Carpinteria area. I highly recommend following the signed “Coast Route” through town. Most major streets are avoided making the route quite pleasant.
My next big stop was in Ventura, where I met up with a friend of mine. He brought me snacks and drinks to refuel and refill with. It was good talking with him and his partner. He was going on a big ride the next day, and invited me to go. I declined, figuring I’d be a bit tired after today. I wanted to talk for a while longer, but he prodded me to continue. It was true. I still had 50 more miles to go. So, we parted ways and I worked my way out of town. After Ventura, I was greeted with many miles of orange and avocado groves. They smelled wonderful and gave me a bit of a lift when I began to encounter some headwinds. The distance between the towns in the Santa Clara River Valley isn’t big, which made it feel like I was going faster than I was.
 By the time I reached Fillmore, I needed a break. I stopped at a gas station at Hwy 23. I picked a good one, they had Mexican Coke there… just what I was looking for. So, I stepped out, sat in a chair out front, and had my Coke. While I was relaxing, another cyclist showed up, and went into the store. After he came back out with his drink, he walked over my way, and we started talking. “Where are you riding today?”, “Is that a cyclocross bike?” The fun part was when I said where I had been riding today. When I told him I started in San Luis Obispo, his first response was “Where is that?” “Well, it is about 100 miles past Santa Barbara”, I replied. His response was amusing. “So… wait… it is 100 miles PAST Santa Barbara and you rode here, WOW! That is a long ride”. It is the best response I’ve received on a ride yet.
The last miles of the ride were the worst. I encountered steadily stronger headwinds, and was getting much more tired. I wondered at times if I was going to be able to make it. The winds had gone from a nice northwest direction to more a northeast direction. This would not be good, especially the last 10 miles. After fighting these winds for about 15 miles I reached Castaic Junction. One look to the north gave me hope. I saw clouds in the Tejon Pass area. Clouds in the pass mean northwest winds, a tailwind again at last! Crossing the Santa Clarita Valley, the last 10 or so miles of my ride, felt quite different to me. My first long distance ride was doing the same thing, crossing Santa Clarita. As I made my way across town I began to have doubts of the mileage. It was looking like I’d come up short. I hadn’t gone this far to not get 200 miles on the odometer. So, I made a couple of small loops in Canyon Country, and still had to go past my destination just to get the mileage. Still, 200 miles was achieved. I accomplished my goal, and did something that only a couple of years ago I thought was impossible. I also found my upper limit for a one-day ride. That limit looks to be 225 to 250 miles, depending on many variables.
And for my next big ride? So many possibilities, so many places to go. I look forward to the next great adventure. Who knows where it will take me?

Long Rides Getting Longer…

It seems I have to redefine what a short ride is for me lately. I’ve been gradually increasing my distance record over the past three years. Sometimes I increase my record by only a few miles, sometimes by a whole lot more.

On May 7, 2011, I took the train to Los Angeles Union Station, and rode home. Downtown Los Angeles and my home in San Diego seem so far apart. They are about 110 miles apart, along the 5. The route I took, which I felt was the easiest and safest route, was 154 miles in length. San Diego may be southeast of Los Angeles but I started my ride heading west. Seems odd to go the opposite way to my destination, but it was the best way. I’ve found a really nice and fast route west from Downtown LA to Mid-City (Vineyard Junction, or for those non-Pacific Electric knowing folk – San Vicente Blvd and Venice Blvd). Past that, the options open up. On that ride, I followed Venice Blvd to Overland Ave, then to the Ballona Creek Trail. It proved to be a good way to bypass a large swath of city in a fast and efficient way. Once at the coast, I took the South Bay Trail down to Redondo Beach. That trail can be quite fun to ride, with all the distractions of the hot surfer boys in their wetsuits to watch!

After Redondo Beach, I followed Palos Verdes Drive North, then around the harbor, and into Long Beach. From Long Beach, I followed the coast the rest of the way down. The ride got more interesting and more tiring through Laguna Beach, with all those rolling hills. Things did look up though, as I found $80 alongside the roadway not long after taking a break just south of Laguna Beach. Sometimes, it does pay to bicycle! It did add a bit of brightness to my day, as the last few miles had been less than fun. Just too much traffic, and too narrow a roadway. Beyond that, there were a few more rolling hills, and San Clemente. At least that town could be avoided, quite nicely too. The signed bike route has sharrows and bike lanes. It can be tougher to follow at the north end, but overall, a good route. Just past San Clemente was San Diego County. So, goodbye Orange County, hello San Diego County!

I kept a good pace most of the route south, stopping in Oceanside for some food. It got dark around Torrey Pines, but most of the ride was over by then. I finally got home right about 8:30pm, tired, a bit sore, but quite happy. It was a long ride, but my next would be even further. I had a 200 mile ride in the works for the end of May.

Big Plans… and changes.

It has been a while since I posted to my blog. I just haven’t had any real big adventures lately. I’ve just been busy with other things. That is changing soon though.

My big August Oregon Coast trip had to be cancelled. Too many problems kept coming up, one of them being cost. So, it will be postponed. I will, however, be going on some “shorter” rides this month. This Saturday, May 7th, I will be embarking on a day ride from downtown Los Angeles to San Diego. The short goal for the ride is Solana Beach. My idea is simple. I go as far south as I can, and see how things are at that point. If I don’t think I can make it up Torrey Pines Grade at mile 140 on a ride, or it is too late by then, I will stop there and take the train home.

This is only a precursor to the longest single day ride yet planned by me. I will be riding from San Luis Obispo to Santa Clarita, a distance of about 200 miles, on May 29th. I already have the route picked out and have ridden the whole thing, just not all at once before. It is the upper limit of what I am willing to ride in a day.

I’ll post more details on the ride as it gets closer.