New Feature – Pass Heights

With all the snow this winter, not to mention the low elevations it has been falling, I thought it would be a good idea to add a “High Points” section to the Southern California Highways pages. These points, so far just name and elevation, show the highest points along each roadway and are located near …

Read more

Featured Image – 12/23/2019

1932/34 concrete at the divergence of the lanes at Grapevine.

Here at Grapevine, a small section of concrete is visible adjacent to the southbound lanes of I-5. This is a section of former US 99. A small color difference can be noticed between the two lanes that are visible. This difference is due to age. The lanes to the left were constructed in 1932 when Grapevine Grade was realigned, bypassing the original 1914 Ridge Route grade. This was built as two lanes as a temporary measure to expedite the opening of the new route. Right after it was opened, a third lane was added, the lane on the right, creating a three-lane roadway with a common passing lane in the center, or “suicide lane”. This condition persisted until 1943 when the road was widened yet again to four lanes. In 1959 – 1960, these lanes were bypassed by the current southbound lanes of I-5. Today, they remain as one of the last remnants of the 1932-1959 version of Grapevine Grade.

Copyright Notice

As it seems it is necessary, I am posting this reminder that all original works on this site are copyrighted by Michael F Ballard. A notice has been posted since the 1990’s regarding this, ever since a newspaper plagiarized three pages on this site and printed them verbatim, without my permission. It is still up …

Read more

Caltrans Sign Change

In June 2019, I sent a message to Caltrans requesting a change in the signage on I-805 northbound at El Cajon Blvd. The sign didn’t reflect the lane assignments and can be confusing to motorists not familiar with the interchange. In November, I got a response and they will not only change the sign but …

Read more

Ridge Route Update

From the Ridge Route Preservation Organization: Finally, some good news! While it is not finalized at the time of this writing, our Volunteer Service Agreement is nearing completion. We got a copy today to review and so far, things look quite promising. We will also be getting a key to the gate, which means we …

Read more